{"id":3327,"date":"2023-05-18T09:31:47","date_gmt":"2023-05-18T07:31:47","guid":{"rendered":"https:\/\/baldocer.com\/?p=3327"},"modified":"2023-05-29T09:46:42","modified_gmt":"2023-05-29T07:46:42","slug":"baldocer-expands-its-photovoltaic-system-with-10000-new-solar-panels","status":"publish","type":"post","link":"https:\/\/baldocer.com\/en\/baldocer-expands-its-photovoltaic-system-with-10000-new-solar-panels\/","title":{"rendered":"Baldocer expands its photovoltaic system with 10,000 new solar panels."},"content":{"rendered":"<p>Baldocer has taken a further step towards <strong>achieving a more efficient and sustainable energy consumption model<\/strong> with the installation and operation of a new photovoltaic system located on the roof of its plant 3, dedicated to large-size production. In total, <strong>10,591 new solar panels<\/strong> with a power of 450 Wp cover approximately half of the 58,000 m\u00b2 roof area of the facility. The new self-consumption system will generate a figure close to 6,000,000 kWh per year, representing <strong>between 25% and 30% of the total plant&#8217;s consumption<\/strong>.<\/p>\n<p>This is not the first time Baldocer has embraced solar energy production for self-consumption. The over 10,000 new panels installed by the company in plant 3 are in addition to <a href=\"https:\/\/baldocer.com\/baldocer-instala-7-000-paneles-solares\/\" target=\"_blank\" rel=\"noopener\">another 7,000 located in its warehouse in Vilafam\u00e9s<\/a>, which started operating in July 2021.<\/p>\n<p>In this way, Baldocer continues to move towards a more independent, sustainable, and efficient energy future.<\/p>\n<p><iframe loading=\"lazy\" title=\"New photovoltaic installation | Baldocer\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/m9WR9glH7Zs?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Baldocer has taken a further step towards achieving a more efficient and sustainable energy consumption model with the installation and operation of a new photovoltaic system located on the roof of its plant 3, dedicated to large-size production. In total, 10,591 new solar panels with a power of 450 Wp cover approximately half of the [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":3334,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-3327","post","type-post","status-publish","format-standard","hentry","category-uncategorized","web-baldocer"],"_links":{"self":[{"href":"https:\/\/baldocer.com\/en\/wp-json\/wp\/v2\/posts\/3327","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/baldocer.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/baldocer.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/baldocer.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/baldocer.com\/en\/wp-json\/wp\/v2\/comments?post=3327"}],"version-history":[{"count":4,"href":"https:\/\/baldocer.com\/en\/wp-json\/wp\/v2\/posts\/3327\/revisions"}],"predecessor-version":[{"id":3332,"href":"https:\/\/baldocer.com\/en\/wp-json\/wp\/v2\/posts\/3327\/revisions\/3332"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/baldocer.com\/en\/wp-json\/wp\/v2\/media\/3334"}],"wp:attachment":[{"href":"https:\/\/baldocer.com\/en\/wp-json\/wp\/v2\/media?parent=3327"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/baldocer.com\/en\/wp-json\/wp\/v2\/categories?post=3327"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/baldocer.com\/en\/wp-json\/wp\/v2\/tags?post=3327"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}